某市拟建高层住宅楼总建筑面积6021m2;。主体结构9层。底层层高4.2m;2-9层层高为3.0 m,房屋总高28.2m。结构形式采用框架结构。柱截面尺寸为600×600mm。横向框架梁截面尺寸250×450mm,纵向框架梁截面尺寸300×500mm。室内外高差为0.45m。结构设防烈度为7度,抗震等级为Ⅱ级。基础采用柱下独立基础,基础埋深2.2m。
本工程建筑功能为公共建筑,使用年限50年,耐火等级为一级。内墙体材料为填充墙,采用200厚蒸压加气混凝土砌块,外墙采用烧结普通空隙粘土砖,240mm厚。外墙装修使用仿石材外墙涂料,室外台阶为水泥台阶,表面铺大理石,散水为细石混凝土散水;室内墙面主要是喷涂乳胶漆,室内地面的装修做法有:大理石地面,防滑地砖地面,实木地板地面,室内顶棚主要采用石棉吸音板;门窗采用塑钢窗和装饰木门;全楼设电梯一部和楼梯一部;地下防水为卷材防水;屋面为膨胀珍珠岩保温、卷材防水屋面;卫生间为聚氨酯涂膜防水。

1目 录
一、编制依据及编制说明 ·······································1
    1.1编制依据 ·················································1
    1.2编制说明 ·················································2
    1.3编制原则与要求 ··········································2
二、工程概况及特点分析 ·········································3
    2.1工程建设概况 ·············································3
    2.2 工程设计概况··············································3
    2.3主要分项工程的工程量 ·····································4
    2.4 建设地点的特征 ··········································4
    2.5 施工条件 ················································4
    2.6特点分析··················································4
三、施 工 部 署··················································5
    3.1 施工管理机构 ·············································5
    3.2施工任务··················································6
    3.3 各分部工程的展开程序······································6
    3.4 施工现场平面布置···············································7
    3.5施工准备工作计划· ········································8
四、主要分部分项工程施工方法··································13
    4.1 工程测量······················································13
    4.2 场地平整·················································14
  4.3 防水工程 ················································15
    4.4 结构工程·················································21
    4.5 屋面工程· ··············································33
    4.6 装饰工程·················································37
    4.7 粉饰工程 ··············································56
五、主要施工保证措施···········································61
5.1 工期保证措施 ············································61
5.2 质量保证措施············································62
5.3 文明现场保证措施········································71
5.4 环境保护措施············································79
5.5 雨季施工保证措施········································80
  结束语 ·······················································83