变电站配套220kV双回线路工程起止点:(1)起于220kV线路破口入XX变后形成的四线46#(三线52#)双回路分支塔,终止于XX变电站;(2)起于XX变,终止于XX变电站,路径长度:2*21.156km+(0.858+0.876)km+(1.188+1.19)km;其中占用原线路路径长度为2*14.687 km。共72基(不包括小徐二线改造1基终端塔)。
1.1.2工程规模
本工程为新建220kV双回路工程,架空线路全长约23.212公里,导线采用2XLGJ—400/35型铝包钢芯铝绞线,地线型号:一根为24芯OPGW光缆,另一根为JLB40-120铝包钢绞线。
1.1.3工程承包范围及承包方式
本工程招标范围:起于220kV线路破口入XX变后形成的四线46#(三线52#)双回路分支塔,终止于XX变电站;2*21.156km+(0.858+0.876)km+(1.188+1.19)km;其中占用原线路路径长度为2*14.687 km。
目 录
第一章 工程概况及特点································5
1.1 工程概况·······································5
1.2 工程特点·······································7
第二章 施工现场组织机构·····························9
2.1 组织机构关系图································9
2.2 工程主要负责人简介及职责·······················10
...................................
第十章 计划、统计和信息管理·······················105
10.1 计划、统计报表的编制与传递····················105
10.2 信息管理·····································106
附件:
附表1:投标人技术、施工力量状况·················109
附表2:投标人自有机械设备一览表················110
附图1:施工现场平面布置图·····················113
附图2:施工进度横道图·························114
附图3:施工进度网络图·························115